Smart meter installation contractor for electric, gas and water utilities

By UPA’s count, its crews installed 1.30 million of the 1.36 million meters and gas modules in LG&E and KU’s Kentucky program between 2022 and 2025; the program total comes from the Kentucky Public Service Commission.

UPA is also National Grid’s installation vendor in Massachusetts and its primary installation contractor in upstate New York. Across all installers, the Massachusetts program passed 500,000 meters in April 2026 and the New York program reached 1.64 million meters and gas modules by April 30, 2026; National Grid doesn’t publish UPA’s share.

A technician wearing a face shield installs an electric meter
A UPA technician installing an electric smart meter.

Electric, gas and water meter installation

Utility Partners of America, LLC (UPA) is a utility field-services contractor headquartered at 1881 Suber Mill Road, Greer, South Carolina. Founded in 1997, UPA has been part of System One since 2009. We install and service electric, gas and water meters, and we also offer meter repair and reading, overhead and underground line construction, private utility locating, lighting, EV charger installation, call-center and material-management services for investor-owned, municipal and cooperative utilities.

Our role on each program

We work directly for utilities and as an installation subcontractor to meter manufacturers. Each program page says which, and separates our crews from the manufacturer and the utility’s own crews, so you can see the work we actually did rather than every meter in a program.

Planning a meter changeout

Start with the commodity, the meter or module type, the work area and the completion window. The scope should also cover meter supply, network responsibilities, customer communication, field records and acceptance. Program-specific commitments go in the agreed scope.

Meters by commodity

Read about water meter installation, gas meters and module retrofits and second-generation smart meter replacement.

Programs we’ve worked on

Each program below says whose number it is: UPA’s own count, the utility’s, or a regulator’s total for every installer.

See the full track record

National Grid New York: AMI installation

New York · 2023 to present

UPA is the primary installation contractor on the National Grid upstate New York program. Across all installers, the program had installed 1,637,031 electric meters and gas modules by April 30, 2026, according to National Grid’s May 2026 report to the New York Department of Public Service. UPA’s share of that total hasn’t been published.

Source: National Grid New York semiannual AMI report, May 29, 2026.

Working with procurement

Use the programs above to judge relevant experience, and ask us for current capacity and qualifications for your contract.

Contractor
Utility Partners of America, LLC, headquartered in Greer, South Carolina
Service
Smart meter installation contractor for electric, gas and water utilities
What the work covers
Electric smart meter exchange; gas meter and communication-module retrofit; water meter exchange and AMI endpoints; customer appointment and call-center support; field work-order documentation; utility-approved data handoff and closeout.
Scope and dates
Set out the asset types, territory, program period, utility responsibilities and acceptance criteria in the RFP.
Qualifications to ask for
Current state and work-specific licenses, insurance, bonding, crew training and dated safety figures with their definitions.
Capacity and service levels
Ask for the staffing plan, production assumptions, escalation process and reporting commitments.
References
The programs listed above. Ask us about reference contacts for your procurement.
Contact
Talk to us about an RFP or call (864) 269-2302

How a program runs

Each phase is agreed with the utility. Durations, staffing, service levels and acceptance rules depend on the contract.

  1. Agree the scopeSettle the asset types, service area, responsibilities and acceptance rules before any field work is assigned.
  2. Plan access and routesSet priorities, customer notices, appointment needs and escalation contacts with the utility.
  3. Do the field workWork to the agreed scope and record the asset information the utility needs.
  4. Review exceptions and dataAgree how incomplete work, access problems and records are reviewed with the utility.
  5. Close outReconcile accepted work and flag any follow-up service or maintenance.

Common questions

Straight answers for utility teams. Customers with a question about an appointment should start with their utility.

How many meters has UPA installed, and who confirms the numbers?

On LG&E and KU’s Kentucky program, UPA counts 988,539 electric meters and 309,534 gas modules, and the Kentucky Public Service Commission confirms the program total and its completion. On National Grid’s programs in Massachusetts and New York, the published totals include every installer, and National Grid doesn’t say how many were UPA’s. Each program page links the source for its numbers.

Does UPA install gas modules and water meters too?

Yes. Our work includes gas module retrofits for LG&E and KU and water meter programs for Tucson Water, OUC, Savannah, Santa Cruz and other cities. We track meter exchanges and module retrofits separately, because they’re different jobs.

Can one contractor handle the meter exchange and customer scheduling?

Yes. UPA does meter exchanges and runs a U.S.-based utility call center. Before crews go out, we agree notice windows, appointments, access problems and escalation with the utility.

Which meter manufacturers and prime contractors has UPA worked with?

Landis+Gyr on LG&E and KU, Itron meters at SMUD, and Sensus at EWEB and Palo Alto, where UPA was the installation subcontractor. Working on a manufacturer’s program doesn’t make UPA a certified partner of that manufacturer.

How are indoor meters, access and opt-outs handled?

The utility sets the rules. Customers should check the utility’s program page or call the number on their bill to confirm an appointment, arrange access or opt out, because each program works a little differently.

What safety and qualification records should a utility ask for?

Ask for current licenses for the work and the state, insurance and bonding documents, crew training records, and EMR, TRIR and DART figures with their dates and definitions. Ask us for the current documents that match your scope.

Sources

The public records behind the figures on this page.

Related reading

All news and articles

Planning a meter or field program?

Tell us the work, the service territory and the timeline. We’ll put you in touch with the people who run that kind of program.