By UPA’s count, its crews installed about 191,000 Itron Riva electric meters for Sacramento Municipal Utility District (SMUD) during the meter change-out through March 2026.

Source: UPA SMUD meter replacement report, May 1, 2026.

By UPA’s count, its crews replaced about 191,000 meters with Itron Riva smart meters for SMUD through March 2026. SMUD’s own tracker showed 192,091 meters installed across the whole program by March 31, 2026.

Key figures

  • SMUD’s tracker showed 192,091 meters installed across the program as of March 31, 2026.
  • UPA’s figure is its own approximate count of the meters its crews replaced.

Replacing smart meters at the end of their life

SMUD names UPA as a contractor on its meter change-out project. Its board records describe the work: installation, scheduling, hiring and training, vehicles, handheld equipment and handling retired meters.

Two numbers, two sources

The 191,000 figure is UPA’s own count. SMUD’s tracker reports the whole program on a stated date, so its total isn’t UPA’s alone, and neither number is a unit price.

See AMI lifecycle and meter maintenance.

Where things stand

SMUD awarded the contract in 2024. UPA counted its installations as of March 15, 2026.